Slide 1

Our Projects

Package 9 (NH-53 Badnera Road-Nagzari Kharda Road section from Belora Kherda Karanja Mangrulpir SH 280 and SH 274 and Murtizapur to Kherda SH 282 excluding Badnera Nagzari) for up gradation to Two Lane paved shoulder/ Four Lane configuration in the state of Maharashtra

Package 9 (NH-53 Badnera Road-Nagzari Kharda Road section from Belora Kherda Karanja Mangrulpir SH 280 and SH 274 and Murtizapur to Kherda SH 282 excluding Badnera Nagzari) for up gradation to Two Lane paved shoulder/ Four Lane configuration in the state of Maharashtra

Length: 16.55 KM

Four laning of Fagne to Gujarat-Maharashtra Border section of NH 6 from Km 510 to Km 650.79 in Maharashtra under NHDP Phase IV.

Four laning of Fagne to Gujarat-Maharashtra Border section of NH 6 from Km 510 to Km 650.79 in Maharashtra under NHDP Phase IV.

Length: 141.59 km.

Four Laning of Khed-Sinnar Section of NH-50 from Km 42+000 to Km 177+000 (Design Length - 137.946 Km) under NHDP Phase IV in the state of Maharashtra on DBFOT Basis

Four Laning of Khed-Sinnar Section of NH-50 from Km 42+000 to Km 177+000 (Design Length - 137.946 Km) under NHDP Phase IV in the state of Maharashtra on DBFOT Basis

Length: 137.94 km.

Four Laning of Amravati- Chikhli section of NH-6 [Package-1 from km 166.000 (Amravati) to km 220.000 (Near Kurankhed)] in the state of Maharashtra

Four Laning of Amravati- Chikhli section of NH-6 [Package-1 from km 166.000 (Amravati) to km 220.000 (Near Kurankhed)] in the state of Maharashtra

Length: 54 km.

Amravati- Chikhli section of NH-6 [Package-II from km 220.000 (Near Kurankhed) to km 270.000 (Near Shelad)] in the state of Maharashtra

Amravati- Chikhli section of NH-6 [Package-II from km 220.000 (Near Kurankhed) to km 270.000 (Near Shelad)] in the state of Maharashtra

Length: 40 km.

Widening of existing road from Km 144.400 to Km 249.000 on the Pune Solapur Section of NH-9.

Widening of existing road from Km 144.400 to Km 249.000 on the Pune Solapur Section of NH-9.

Length: 105 km.

Development of existing roads where bypasses are provided, in towns/village (Ule, Suratgaon, Malumbra, TuIjapur, Shingoli & Yedshi) On NH-211 (New-NH-52) & Naldurg,Omarga on NH-09 ,(New NH-65) In the State of Maharashtra on EPC Mode

Development of existing roads where bypasses are provided, in towns/village (Ule, Suratgaon, Malumbra, TuIjapur, Shingoli & Yedshi) On NH-211 (New-NH-52) & Naldurg,Omarga on NH-09 ,(New NH-65) In the State of Maharashtra on EPC Mode

Length: 5 km.

Improvement to Paud Kolvan Lonavala Road, MDR 26, Km 16/400 to 41/300, Tal. Maval, Dist. Pune, and associated roads - Image 1

Improvement to Paud Kolvan Lonavala Road, MDR 26, Km 16/400 to 41/300, Tal. Maval, Dist. Pune, and associated roads

Length: 71.16 km.

Improvements to Malharpeth- Umbraj- Masur- Mayani - Diganchi -Mahud Pandharpur Road S.H.143 (Km 55/000 to 153/420) in the state of Maharashtra under MRIP on Hybrid Annuity Mode - Image 1

Improvements to Malharpeth- Umbraj- Masur- Mayani - Diganchi -Mahud Pandharpur Road S.H.143 (Km 55/000 to 153/420) in the state of Maharashtra under MRIP on Hybrid Annuity Mode

Length: 46.08 km.

Improvement of roads connecting the tourist destination in Pune District (Panshet, Lonavala, Rajmachi. Torna, Sinhgad, Purandar) - Image 1

Improvement of roads connecting the tourist destination in Pune District (Panshet, Lonavala, Rajmachi. Torna, Sinhgad, Purandar)

Length: 51.18 km.

Improvements to Roads in Industrial Sector in Pune District (Hinjewadi, Chakan, Talegaon, Ranjangaon, Jejuri) - Image 1

Improvements to Roads in Industrial Sector in Pune District (Hinjewadi, Chakan, Talegaon, Ranjangaon, Jejuri)

Length: 58.36 km.

Improvements to Mahabaleshwar Satara Rahimatpur Pusesawali Vita Road, SH - 140 in the state of Maharashtra under MRIP on Hybrid Annuity Mode. - Image 1

Improvements to Mahabaleshwar Satara Rahimatpur Pusesawali Vita Road, SH - 140 in the state of Maharashtra under MRIP on Hybrid Annuity Mode.

Length: 71.78 km.

Consultancy Services for Feasibility study and preparation of Detail Project Report (DPR) for improvement and up-gradation of newly declared National Highways in the State of Uttar Pradesh.

Consultancy Services for Feasibility study and preparation of Detail Project Report (DPR) for improvement and up-gradation of newly declared National Highways in the State of Uttar Pradesh.

Length: 60 km.

Construction of Eight lane access-controlled Expressway from Km 103.400 to Km 128.000 of Vadodara Mumbai Expressway in the State of Gujarat, UT of DNH and Maharashtra on Hybrid Annuity Mode under Bharatmala Pariyojana. - Image 1

Construction of Eight lane access-controlled Expressway from Km 103.400 to Km 128.000 of Vadodara Mumbai Expressway in the State of Gujarat, UT of DNH and Maharashtra on Hybrid Annuity Mode under Bharatmala Pariyojana.

Length: 24.60 km.

Construction of Eight lane access-controlled Expressway from km 128.000 to km 154.600 of Vadodara Mumbai Expressway in the state of Gujarat on Hybrid Annuity mode under Bharatmala Pariyojna. - Image 1

Construction of Eight lane access-controlled Expressway from km 128.000 to km 154.600 of Vadodara Mumbai Expressway in the state of Gujarat on Hybrid Annuity mode under Bharatmala Pariyojna.

Length: 26.60 km.

Construction of Eight lane access-controlled Expressway from Km 154.600 to Km 190.000 of Vadodara Mumbai Expressway in the State of Gujarat on Hybrid Annuity Mode under Bharatmala Pariyojana. - Image 1

Construction of Eight lane access-controlled Expressway from Km 154.600 to Km 190.000 of Vadodara Mumbai Expressway in the State of Gujarat on Hybrid Annuity Mode under Bharatmala Pariyojana.

Length: 35.400 km.

Balance Work under Phase -II for 4 laning of Khed Sinner Section of NH-50 (New NH-60) Comprising of the Stretches of Kalamb Bypass, Bhatkalwadi, and Alephata bypass in the State of Maharashtra.

Balance Work under Phase -II for 4 laning of Khed Sinner Section of NH-50 (New NH-60) Comprising of the Stretches of Kalamb Bypass, Bhatkalwadi, and Alephata bypass in the State of Maharashtra.

Length: 8.634 km.

Balance work of Khed Ghat Realignment and Narayangaon Bypass on Khed - Sinnar section of NH - 60 in the State of Maharashtra on EPC Mode. - Image 1

Balance work of Khed Ghat Realignment and Narayangaon Bypass on Khed - Sinnar section of NH - 60 in the State of Maharashtra on EPC Mode.

Length: 9.319 km.

Four Laning of NH-52 (New-NH 15) from end of Biswanath Chariali by-pass to Gohpur in the state of Assam on EPC mode.

Four Laning of NH-52 (New-NH 15) from end of Biswanath Chariali by-pass to Gohpur in the state of Assam on EPC mode.

Length: 57.50 km.

4-lanning of Balwara to Dhangaon section of NH-347BG & 753L in the State of Madhya Pradesh under Bharatmala Pariyojana Phase-I.

4-lanning of Balwara to Dhangaon section of NH-347BG & 753L in the State of Madhya Pradesh under Bharatmala Pariyojana Phase-I.

Length: 40.40 km.

Rehabilitation and Upgradation to Intermediate Lane configuration of Shri Kyari - Gumma section of NH-707 in the State of Himachal Pradesh under Green National Highways Corridor project (GNHCP) with the loan assistance of World Bank on EPC mode.

Rehabilitation and Upgradation to Intermediate Lane configuration of Shri Kyari - Gumma section of NH-707 in the State of Himachal Pradesh under Green National Highways Corridor project (GNHCP) with the loan assistance of World Bank on EPC mode.

Length: 19.900 km.

Detailed Project Report of additional Service Road / Slip Road in the stretch of Pune-Solapur section NH-65 in the State of Maharashtra as Standalone project on EPC Mode.

Detailed Project Report of additional Service Road / Slip Road in the stretch of Pune-Solapur section NH-65 in the State of Maharashtra as Standalone project on EPC Mode.

Length: 16.645 km.

Copyright 2024 © CDF Infracon Private Limited . All Rights Reserved.@knyttneve